Language suggestion

It looks like your preferred language is:

09120000000 Support: Sat–Thu, 9 AM – 6 PM

Servo Safe-Torque-Off & safety I/O validation (STO/SS1/SLS)

3 4 4 0 0.0

STO tested via independent dual-channel A/B disconnection; response time measured <10 ms; SS1 verified with controlled deceleration ramp; SLS tested at 10 % rated speed; validation protocol prepared per IEC 62061 SIL2.

WhatsApp consultation
Estimated lead time (days)
8
Warranty (days)
120
From
$1.90
STO tested via independent dual-channel A/B disconnection; response time measured <10 ms; SS1 verified with controlled deceleration ramp; SLS tested at 10 % rated speed; validation protocol prepared per IEC 62061 SIL2.
  • PDF
  • Mitsubishi Electric